To place a document on Hold the document must be Available. In addition, both the sender and receiver of the document must use Inovisworks.
To put a document on hold
1 Click the Document Tracking tab.
2
4A message requests the status change confirmation.
5 Click Continue.A check mark under the Result field shows the document is on hold.
6 Click Done and the Document List page opens.
![]() © 2016 GXS, Inc. |